Construction commences on stage two of Origin’s 2GWh Eraring BESS in New South Wales, Australia

Australian utility Origin Energy yesterday (30 October) confirmed it had started construction on the second phase of its 2.1GWh Eraring battery energy storage system (BESS) in New South Wales, Australia.

Construction commences on stage two of Origin’s 2GWh Eraring BESS in New South Wales, Australia

You are not logged in

If you want to read more, join the  ENERGY-HUB club

Login

Try the monthly membership in the ENERGY-HUB club for free!

Related articles

Water isn’t always the best answer to BESS fires

Fire protection engineers urge a defensive approach to battery fires, focusing on preventing thermal runaway from spreading rather…

Hard times for pay-as-you-go model

While sales of off-grid solar kits increased slightly in 2024, the market has not regained the momentum seen before 2022. The late…

Chinese PV Industry Brief: Eging PV posts $288 million net loss for 2024

Eging PV has reported its steepest annual loss on record in 2024, posting a net loss of CNY 2.09 billion ($288 million), compared…

German energy consumption jumps “surprisingly” due to weak renewables output in early 2025

Energy consumption in Germany has seen a “surprisingly strong” increase in the first three months of 2025, an analysis by AG Energ…

‘No upper limit to what we can procure’: AEMO Services on the latest New South Wales LDES tender

In a recent webinar hosted by AEMO Services, the latest New South Wales long-duration energy storage (LDES) tender round was in th…

ENERGY-HUB is a modern independent platformsharing news and analytic articles from the energy sector on a daily basis. Within our portfolio we monitor czech, slovak and foreign press releases.

89938
Number of published news
2092
Number of published events
1184
Number of published articles
ENERGY-HUB uses ČTK news (The Czech News Agency), the content is protected by copyright law.
Transcription, distribution, or other dissemination of the whole or of a part of the content is prohibited without prior consent.
Drtinova 557/10, 150 00 Praha 5, Česká republika