Northvolt raises US$1.2 billion and produces first BESS at Poland plant
European lithium-ion gigafactory firm Northvolt has started producing battery energy storage systems (BESS) at its Northvolt Dwa facility in Poland, while also securing a US$1.2 billion convertible note.
You are not logged in
If you want to read more, join the ENERGY-HUB club
LoginTry the monthly membership in the ENERGY-HUB club for free!
Related articles
ERCOT market saturation ‘already happening’
Market saturation in the Texas, ERCOT ancillary services market is already happening as the BESS buildout accelerates, Energy-Stor…
Ireland: ESB Networks says energy storage on grid now exceeds 1GW
ESB Networks has announced that Ireland’s electricity grid now has 1GW of energy storage available from different energy storage a…
Britishvolt ESS gigafactory plan dead after Blackstone buys site for data centre
The Britishvolt saga and any potential for a lithium-ion gigafactory at the Northumberland, UK site looks to be over after US priv…
UK’s SSE Renewables completes first 100MWh BESS project in England
SSE Renewables has launched its first operative battery energy storage system (BESS) with a capacity of 50MW/100MWh.
NHOA commissions 120MWh BESS in Taiwan
Electric vehicle (EV) and energy storage technology firm NHOA has commissioned a 120MWh battery energy storage system (BESS) in Ta…
ENERGY-HUB is a modern independent platformsharing news and analytic articles from the energy sector on a daily basis. Within our portfolio we monitor czech, slovak and foreign press releases.